Please use this identifier to cite or link to this item: https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/78002
Export to Endnote
Title: Annual report for period 13 June 1987 to 12 June 1988 True Blue Prospect MLC 619
Title Holder / Company: Appel, W
Report id: CR1988-0351
Tenure: MLC619
Year: 1981
Abstract: Three RC holes were drilled with the better result being 0.08 grams per tonne Au from 11 to 12m within hole SATB 1. The three hole RC drilling program at True Blue did not result in any significant gold bearing lodes being defined. An aim of the drilling was to determine the extent and continuity of a surface gold bearing lode in a north-northeast trending zone. This lode was not intersected in drilling although some evidence of minor samples did not provide any encouragement to carry out further drilling work on the prospect.
Date Added: 14-Apr-2014
Appears in Collections:Minerals Exploration Reports (MEX)

Files in this Report:
File SizeFormat Add to
Download
CR19880351.pdf405.46 kBPDF Add


Items in GEMIS are protected by copyright unless otherwise indicated.

Get Adobe Reader