Please use this identifier to cite or link to this item:
Export to Endnote
https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/77962
Export to Endnote
Title: | EL 4578 Annual report 12 months ending 2 September 1986 |
Title Holder / Company: | Hall, B Cleary, C |
Report id: | CR1986-0277 |
Tenure: | EL4578 |
Year: | 1986 |
Abstract: | Results of sampling during this report period in the southern part of the area have been encouraging and more detailed hardrock sampling together with bulk testing of elluvial deposits is planned for the 1987 season. The central lateritic portion of the EL has been tested and the results were found to be disappointing. Sample results from drainage in the northern part of the area have been disappointing but the area lends itself to dams and water control. |
Date Added: | 10-Apr-2014 |
Appears in Collections: | Minerals Exploration Reports (MEX) |
Files in this Report:
File | Size | Format | Add to Download |
---|---|---|---|
CR19860277.pdf | 476.92 kB | Add |
Items in GEMIS are protected by copyright unless otherwise indicated.