Please use this identifier to cite or link to this item: https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/77962
Export to Endnote
Title: EL 4578 Annual report 12 months ending 2 September 1986
Title Holder / Company: Hall, B
Cleary, C
Report id: CR1986-0277
Tenure: EL4578
Year: 1986
Abstract: Results of sampling during this report period in the southern part of the area have been encouraging and more detailed hardrock sampling together with bulk testing of elluvial deposits is planned for the 1987 season. The central lateritic portion of the EL has been tested and the results were found to be disappointing. Sample results from drainage in the northern part of the area have been disappointing but the area lends itself to dams and water control.
Date Added: 10-Apr-2014
Appears in Collections:Minerals Exploration Reports (MEX)

Files in this Report:
File SizeFormat Add to
Download
CR19860277.pdf476.92 kBPDF Add


Items in GEMIS are protected by copyright unless otherwise indicated.

Get Adobe Reader