Please use this identifier to cite or link to this item: https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/77897
Export to Endnote
Title: Annual report, Warrego North Project, EL 24138, period 8 October 2006 to 8 October 2007
Title Holder / Company: Image Resources
Meteoric Resources
Report id: CR2007-0749
Tenure: EL24138
Year: 2007
Author: Dance, B
Abstract: Late in the reporting year, Meteoric resources followed up with access tracks to the area of anomalies generated from the data processed during the previous reporting period but untested by drilling and conducted a ground survey with a newly purchased Spectrometer to try to locate near surface iron stone occurrences. Problems with computer processing of the data has delayed any further work and the results of this survey are unavailable for reporting at present. As no new targets were generated, no further work was completed after a very disappointing exercise. It is possible the program will have to be repeated next field season even though it worked well on other prospects in the general area.
Date Added: 27-Mar-2014
Appears in Collections:Minerals Exploration Reports (MEX)

Files in this Report:
File SizeFormat Add to
Download
EL24138_2007_A.pdf42.4 kBPDF Add


Items in GEMIS are protected by copyright unless otherwise indicated.

Get Adobe Reader