Please use this identifier to cite or link to this item: https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/77895
Export to Endnote
Title: MLC 522 First annual report, Tennant Creek Project
Title Holder / Company: Asarco Australia
Top End Resources
Report id: CR1988-0380
Tenure: MLC522
Year: 1988
Author: Johnson, D
Abstract: This report is a summary of the work to date on MLC 522 known as the Aga Khan since a joint venture was entered into between Asarco Australia Ltd and Top End Resources on May 23, 1988. In brief the area was gridded with fifty metre spacing and mapped on a scale of 1:1000. Geochemical analyses were taken of rock chip samples taken around the old workings. An airborne survey was flown by Aerodata over the area of which this lease was an integral part. Interpretation and enhancement of the airborne data is in progress. Available data is being studied with a view to selecting drill targets.
Date Added: 27-Mar-2014
Appears in Collections:Minerals Exploration Reports (MEX)

Files in this Report:
File SizeFormat Add to
Download
CR19880380.pdf2.1 MBPDF Add


Items in GEMIS are protected by copyright unless otherwise indicated.

Get Adobe Reader