Please use this identifier to cite or link to this item: https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/77858
Export to Endnote
Title: Second annual and final technical report for the period 1 November 2011 to 1 November 2013, Djambidjimba Project
Title Holder / Company: Royal Resources
Report id: CR2013-1004
Tenure: EL28701
Year: 2013
Author: Faris, I
Lawrence, B
Abstract: During the two year tenure all exploration efforts were focused on determining the uranium prospectivity of the Mount Eclipse Sandstone by desktop studies in order to collaborate EL 28701 with the surrounding Ngalia Basin tenement holdings. No field work was undertaken as Royal was awaiting the finalisation of Exploration Agreements with the CLC on behalf of the Traditional Owners. This work identified that the Mt Eclipse Sandstone overlies an irregular basement, which in turn is overlain by incised Tertiary channels, probably controlled by structure and the incompletely buried topography. It is assumed at this stage that the structures extend through the Mt Eclipse Sandstone but this has not been confirmed. Changes in the Company's exploration focus have resulted in surrender of the tenement.
Date Added: 23-Mar-2014
Appears in Collections:Minerals Exploration Reports (MEX)

Files in this Report:
File SizeFormat Add to
Download
EL28701_2013_AS.pdf2.65 MBPDF Add


Items in GEMIS are protected by copyright unless otherwise indicated.

Get Adobe Reader