Please use this identifier to cite or link to this item:
Export to Endnote
https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/77832Export to Endnote
| Title: | EL 25347 Allambi Project, Annual exploration report for the period 12 March 2012 to 11 March 2013 |
| Title Holder / Company: | Excelsior Gold |
| Report id: | CR2013-0195 |
| Tenure: | EL25347 |
| Year: | 2013 |
| Author: | L'Heureux, R |
| Abstract: | Exploration field work was not conducted during the reporting period. Sampling from the previous reporting year did not return significant results forcing a re-evaluation of the exploration methodology and prospectivity of the tenement. Parker Resources NL aims to conduct a detailed airborne geophysical survey of the tenement to facilitate more effective exploration with rock and soil sampling, and drilling. |
| Date Added: | 10-Mar-2014 |
| Appears in Collections: | Minerals Exploration Reports (MEX) |
Files in this Report:
| File | Size | Format | Add to Download |
|---|---|---|---|
| EL25347_2013_A.pdf | 557.61 kB | Add |
Items in GEMIS are protected by copyright unless otherwise indicated.