Please use this identifier to cite or link to this item:
Export to Endnote
https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/77602
Export to Endnote
Title: | Final report for period 13 April 2006 to 3 July 2013 |
Title Holder / Company: | Northern Mining |
Report id: | CR2013-0833 |
Tenure: | EL24746 |
Year: | 2013 |
Author: | Townsend-Hick, R |
Abstract: | Unfortunately no field work was completed on EL 24746 during the final year of tenure. For most of the year, Northern Mining was busy with other projects in the Northern Territory and Western Australia. Work carried out during pervious years included desktop studies, reconnaissance field trips, airborne EM, water sampling (15 samples), vegitation sampling (15 samples), and contribution to the NTGS helicopter-borne regional gravity survey. However the recent downturn of the mining industry and the difficulty raising significant funds led Northern Mining to scale back its exploration expenditure and surrender EL 24746. |
NOTE: | See CR2009-0693 for Geophysics, biogeochem and water sampling data |
Date Added: | 6-Nov-2013 |
Appears in Collections: | Minerals Exploration Reports (MEX) |
Files in this Report:
File | Size | Format | Add to Download |
---|---|---|---|
EL24746_2013_S.pdf | 2.33 MB | Add |
Items in GEMIS are protected by copyright unless otherwise indicated.