Please use this identifier to cite or link to this item:
Export to Endnote
https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/77573
Export to Endnote
Title: | Annual report for Crawford Creek, EL 24948 for the period 3 July 2011 to 2 July 2012 |
Title Holder / Company: | Northern Mining |
Report id: | CR2012-0545 |
Tenure: | EL24948 |
Year: | 2012 |
Author: | Green, M |
Abstract: | In the sixth year of tenure no substantial field work was completed. A reconnaissance trip to show new management the area was completed, but bush fires in the area caused rescheduling of two field mapping and sampling trips. This work has now been rescheduled to September 2012. The recent release by the Northern Territory Geological Survey of processed ASTER imagery over the entire NT has provided a useful dataset that needs to be explored. The initial images for EL 24948 have been imported into Northern Mining's GIS and preliminary images have been generated. Ground truthing is required to obtain maximum benefit of these images. |
Date Added: | 6-Nov-2013 |
Appears in Collections: | Minerals Exploration Reports (MEX) |
Files in this Report:
File | Size | Format | Add to Download |
---|---|---|---|
EL24948_2012_A.pdf | 6.01 MB | Add |
Items in GEMIS are protected by copyright unless otherwise indicated.