Please use this identifier to cite or link to this item: https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/77347
Export to Endnote
Title: Final technical report EL 26478 Western Creek 3 June 2008 to 12 April 2013
Title Holder / Company: Toro Energy
Report id: CR2013-0482
Tenure: EL26478
Year: 2013
Author: Rawlings, D
Sullivan, C
Abstract: This Final Technical Report for EL 26478 covers work carried out by Toro Energy during tenure from 3 June 2008 to 12 April 2013. Tempest (AEM) was flown and six aircore holes completed over an interpreted palaeochannel. Multielement assays were obtained and no anomalous results warranted followup. No palaeochannel facies were present, nor was any uranium mineralisation encountered. Lithologies indicate AEM anomaly is a result of a structural feature rather than a palaeochannel. This is indicated by the shallow depth to basement consisting of sheared metamorphics.
Date Added: 28-Oct-2013
Appears in Collections:Minerals Exploration Reports (MEX)

Files in this Report:
File SizeFormat Add to
Download
EL26478_2013_S_01.pdf991.44 kBPDF Add
EL26478_2013_S_02_Ssample.txt1.64 kBText Add
EL26478_2013_S_03_SSAssay.txt4.59 kBText Add
EL26478_2013_S_04_DHLocations.txt1.72 kBText Add
EL26478_2013_S_05_DHLithology.txt17.73 kBText Add
EL26478_2013_S_06_DHAssay.txt7.88 kBText Add
EL26478_2013_S_07_DHRadiometrics.txt527.25 kBText Add
EL26478_2013_S_08_Lithology_Code.pdf74.7 kBPDF Add
CR2013-0482_Tempest_Data.zip4.47 MBZIP Add


Items in GEMIS are protected by copyright unless otherwise indicated.

Get Adobe Reader