Please use this identifier to cite or link to this item: https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/77308
Export to Endnote
Title: Eighth annual and final technical report for the period 6 June 2005 to 29 April 2013, EL 22707 Arrla Bay 3
Title Holder / Company: Rio Tinto Exploration
Report id: CR2013-0302
Tenure: EL22707
Year: 2013
Author: Faragher, A
Abstract: The tenement was originally considered prospective for lateritic bauxite, however the drilling conducted in the 2007 dry season greatly downgraded the potential and returned generally negative results for bauxite and diamonds. Results from the helicopter supported sampling program in May 2012 did not identify any uranium anomalies and as such the tenement has been surrendered.
Date Added: 28-Oct-2013
Appears in Collections:Minerals Exploration Reports (MEX)

Files in this Report:
File SizeFormat Add to
Download
EL22707_2013_AS_01.pdf304.4 kBPDF Add
EL22707_2013_AS_02_surfacegeochem.txt259.21 kBText Add
EL22707_2013_AS_03_SSgeochem_ICP.txt3.9 kBText Add
EL22707_2013_AS_04_drillcollars.txt1.99 kBText Add
EL22707_2013_AS_05_DHgeochem_XRF.txt8.61 kBText Add
EL22707_2013_AS_06_lithology.txt4.62 kBText Add
CR2013-0302_Figures.zip2.32 MBZIP Add


Items in GEMIS are protected by copyright unless otherwise indicated.

Get Adobe Reader