Please use this identifier to cite or link to this item:
Export to Endnote
https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/77264
Export to Endnote
Title: | Year 3 Reduction report EL 27719 Ooratippra Project for the reporting period 16 July 2010 to 21 February 2013 |
Title Holder / Company: | CKA Resources |
Report id: | CR2013-0143 |
Tenure: | EL27719 |
Year: | 2013 |
Author: | Chapman, A |
Abstract: | During year 3 a further 10 blocks were relinquished. This report details the work completed on the year 3 relinquished ground for the duration that it was held. In 2010 the previous owner of the Ooratippra project ELs, NT Resources Ltd, applied for and was awarded a 'bringing forward discovery' geophysics collaboration with the NT Government for the Ooratippra project. A 1km spaced gravity survey was completed by NT Resources as set out in the collaboration. A total of 10 stations were taken within the relinquished ground and no significant gravity anomalies were returned. Due to the absence of significant gravity anomalism the blocks were selected for relinquished as part of a project wide reduction during year 3. |
NOTE: | See CR2011-0048 collaborations report for 2010 Gravity Survey data |
Date Added: | 28-Oct-2013 |
Appears in Collections: | Minerals Exploration Reports (MEX) |
Files in this Report:
File | Size | Format | Add to Download |
---|---|---|---|
EL27719_2013_P_01.pdf | 2.99 MB | Add | |
EL27719_2013_P_02_Ooratippra_Gravity_Acquisition_Memo.pdf | 6.01 MB | Add | |
EL27719_2013_P_03_gravpoints_reductionyr3_2013.csv | 10.27 kB | Unknown | Add |
Items in GEMIS are protected by copyright unless otherwise indicated.