Please use this identifier to cite or link to this item:
Export to Endnote
https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/77072
Export to Endnote
Title: | Partial relinquishment report for period 18 September 2009 to 17 September 2012, EL 27138 Cooloola |
Title Holder / Company: | Toro Energy |
Report id: | CR2012-0810 |
Tenure: | EL27138 |
Year: | 2012 |
Author: | Rawlings, D Sullivan, C |
Abstract: | Exploration work has been carried out has involved; a SkyTEM airborne electromagnetic (AEM) survey, covering 1625 km2 (full survey); a collaborative geophysical survey between Toro Energy and the NT Department of Resources; and Reconnaissance field work to check access and liaise with stakeholders. Unfortunately, in light of ballooning rentals and compensation costs, Toro have been forced to relinquish half of the tenement without having drill tested any of it. |
NOTE: | See CR2010-0630 collaborations report for geophysics |
Date Added: | 28-Oct-2013 |
Appears in Collections: | Minerals Exploration Reports (MEX) |
Files in this Report:
File | Size | Format | Add to Download |
---|---|---|---|
EL27138_2012_P.pdf | 1.5 MB | Add |
Items in GEMIS are protected by copyright unless otherwise indicated.