Please use this identifier to cite or link to this item: https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/77072
Export to Endnote
Title: Partial relinquishment report for period 18 September 2009 to 17 September 2012, EL 27138 Cooloola
Title Holder / Company: Toro Energy
Report id: CR2012-0810
Tenure: EL27138
Year: 2012
Author: Rawlings, D
Sullivan, C
Abstract: Exploration work has been carried out has involved; a SkyTEM airborne electromagnetic (AEM) survey, covering 1625 km2 (full survey); a collaborative geophysical survey between Toro Energy and the NT Department of Resources; and Reconnaissance field work to check access and liaise with stakeholders. Unfortunately, in light of ballooning rentals and compensation costs, Toro have been forced to relinquish half of the tenement without having drill tested any of it.
NOTESee CR2010-0630 collaborations report for geophysics
Date Added: 28-Oct-2013
Appears in Collections:Minerals Exploration Reports (MEX)

Files in this Report:
File SizeFormat Add to
Download
EL27138_2012_P.pdf1.5 MBPDF Add


Items in GEMIS are protected by copyright unless otherwise indicated.

Get Adobe Reader