Please use this identifier to cite or link to this item:
Export to Endnote
https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/77045
Export to Endnote
Title: | Partial relinquishment report, Don Creek EL 27653 |
Title Holder / Company: | Natural Resources Exploration |
Report id: | CR2012-0762 |
Tenure: | EL27653 |
Year: | 2012 |
Author: | Munro, N |
Abstract: | NRE completed two (2) reconnaissance helicopter assisted field trips of the Barkly Project, one in July 2010 and the other in October 2010. NRE introduced themselves to local landholders, assessed a number of field targets across the tenement and carried out geological mapping of the project area. The field trips proved successful in evaluating the tenements in the most effective and timely manner possible. Geological characteristics were recorded at each site and bulk surface samples were collected. Although no samples were collected from within the relinquished area itself, NRE based its conclusions on the results of samples collected within the retained area and the surrounding tenements within the region. NRE has been able to successfully analyse the work conducted in the first term and integrate and collate the results of the specialised phosphate study with all available geological, geophysical and drill and bore hole data and was able to characterise the stratigraphic relationships pertaining to phosphate mineralisation to identify the most prospective areas within its Barkly Project tenures. In relation to the relinquished area, NRE has concluded that the potential for mineralisation within this area is much lower than the remaining tenement area. |
Date Added: | 28-Oct-2013 |
Appears in Collections: | Minerals Exploration Reports (MEX) |
Files in this Report:
File | Size | Format | Add to Download |
---|---|---|---|
EL27653_2012_P.pdf | 2.22 MB | Add |
Items in GEMIS are protected by copyright unless otherwise indicated.