Please use this identifier to cite or link to this item:
Export to Endnote
https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/76992
Export to Endnote
Title: | Annual and final report EL 26977, 23 July 2009 to 13 September 2012 |
Title Holder / Company: | Fertoz |
Report id: | CR2012-0612 |
Tenure: | EL26977 |
Year: | 2012 |
Author: | Szonyi, L |
Abstract: | Work conducted in the third year consisted of desk top studies and the submission of a Mine Management Plan for the Barrow Creek Project focussing initially on EL 26915. The exploration work done to date has not successfully explored EL 26977 for the presence of phosphate mineralisation. What limited work that has been done has proved that the transported soils effectively are geochemically blanketing the underlying rocks. The only effective way to examine the underlying strata is by drilling, firstly using either Aircore (recommended) or Reverse Circulation methods. Fertoz does not have the funds to carry out drilling in the next twelve months. It has given priority in the Barrow Creek project to EL 26915 which it has entered into a joint venture with NuPower Resources. Consequently it has decided to relinquish EL 26977 and carry out no further exploration. |
Date Added: | 28-Oct-2013 |
Appears in Collections: | Minerals Exploration Reports (MEX) |
Files in this Report:
File | Size | Format | Add to Download |
---|---|---|---|
EL26977_2012_AS_01.pdf | 3.89 MB | Add | |
EL26977_2012_AS_02_METADATA.txt | 1.63 kB | Text | Add |
EL26977_2012_AS_03_SurfaceGeochem.txt | 21.03 kB | Text | Add |
Items in GEMIS are protected by copyright unless otherwise indicated.