Please use this identifier to cite or link to this item:
Export to Endnote
https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/76783
Export to Endnote
Title: | Partial relinquishment report for period ending 15 January 2012 |
Title Holder / Company: | Minemakers Australia |
Report id: | CR2012-0078 |
Tenure: | EL26185 |
Year: | 2012 |
Author: | Pellatt, A Fulton, R |
Abstract: | This report details work completed on a relinquished portion of EL 26185 comprising 52 sub-blocks. A total of 3 rock chip samples were collected and assayed for a multi-element suite. No anomalous results were returned with the highest values being 6 ppm U, 88 ppm Th and 260 ppm P. One RC hole for 69m was drilled as part of a scout drilling program and failed to produce any significant economic phosphate mineralisation at shallow depths a maximum of 14.00% P2O5 returned between 68-96m depth. As a result, this portion of the tenement was relinquished. |
Date Added: | 28-Oct-2013 |
Appears in Collections: | Minerals Exploration Reports (MEX) |
Files in this Report:
File | Size | Format | Add to Download |
---|---|---|---|
EL26185_2012_P_01.pdf | 768.72 kB | Add | |
EL26185_2012_P_02_DrillCollars.txt | 2.68 kB | Text | Add |
EL26185_2012_P_03_DownholeGeochem.txt | 4.4 kB | Text | Add |
EL26185_2012_P_04_Lithology.txt | 5.53 kB | Text | Add |
EL26185_2012_P_05_MAGN2012P.txt | 3.31 kB | Text | Add |
EL26185_2012_P_06_DOWN2012P.txt | 3.21 kB | Text | Add |
EL26185_2012_P_07_SurfaceGeochem.txt | 4.42 kB | Text | Add |
EL26185_2012_P_08_LithCodes.txt | 4.45 kB | Text | Add |
EL26185_2012_P_09_VerificationList.txt | 1.89 kB | Text | Add |
Items in GEMIS are protected by copyright unless otherwise indicated.