Please use this identifier to cite or link to this item:
Export to Endnote
https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/76769
Export to Endnote
Title: | Partial relinquishment report for period ending 12 February 2012, EL 9725 and EL 10136 Hammer Hill project |
Title Holder / Company: | Arafura Resources |
Report id: | CR2012-0045 |
Tenure: | EL9725; EL10136 |
Year: | 2012 |
Author: | Green, M |
Abstract: | In 2007, Mithril Resources flew a 1325 line km VTEM survey over the entire project area including the relinquished portions of EL 9725 and 10136. Interpretation of this survey identified a number of weak conductors within the relinquished portion of EL 10136. Unfortunately, these anomalies did not rate for follow-up sampling or drilling, although field visits were made to see whether there were any surface features of the anomalies. The data from this VTEM survey were submitted to NTGS by Mithril Resources in 2008. No other work was completed on the relinquished portions of EL 9725 or EL 10136. |
Date Added: | 28-Oct-2013 |
Appears in Collections: | Minerals Exploration Reports (MEX) |
Files in this Report:
File | Size | Format | Add to Download |
---|---|---|---|
EL9725_10136_2011_P.pdf | 1.37 MB | Add | |
CR2012-0045_Geophysics.zip | 98.45 MB | ZIP | Add |
Items in GEMIS are protected by copyright unless otherwise indicated.