Please use this identifier to cite or link to this item: https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/76719
Export to Endnote
Title: EL 25708 Annual and final report for period ending 19 December 2011 Murphy project
Title Holder / Company: Murphy Uranium
Report id: CR2011-1116
Tenure: EL25708
Year: 2011
Author: Esser, D
Abstract: Exploration during the 2011 field season comprised an environmental audit which involved checking that rehabilitation of drill holes and tracks was completed on EL 25708. All drill holes were satisfactorily rehabilitated. Drilling in 2009 intersected Proterozoic basement at approx 400m depth in MURD011 so the potential for finding economic uranium at this depth is considered limited. The airborne EM survey conducted in 2010 did not locate a significant conductive unit (reductant for uranium mineralisation) within the basement. Based on the depth to basement and the cost of drilling to that depth EL 25708 was surrendered in total and no further work is recommended.
Date Added: 28-Oct-2013
Appears in Collections:Minerals Exploration Reports (MEX)

Files in this Report:
File SizeFormat Add to
Download
EL25708_2011_AS.pdf5.43 MBPDF Add


Items in GEMIS are protected by copyright unless otherwise indicated.

Get Adobe Reader