Please use this identifier to cite or link to this item: https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/76713
Export to Endnote
Title: Annual exploration report EL 25311 for period ending 21 December 2011 Pine Creek East
Title Holder / Company: Australia Mining & Gemstone
Report id: CR2011-1099
Tenure: EL25311
Year: 2011
Author: Hou, M
Abstract: Exploration is planned to target Au mineralization (Quartz Vein-hosted) along the structure belt according to the works done last year. And a drilling program will be taken. Work carried out by AMG during Year 5 included: IP sections sound for special area along the structural belt about 43 points for two sections; some geological mapping along the belt about 9.39 Km2; some geological sections surveying about 1.66Km; Whole rocks analysis for Au about 11samples those taken during the geological survey along the belt. Because the dry season, the results of the IP sections sound survey was bad so we cannot decided to take the drilling program, but we try to do more works in the next year and try to take drilling.
Date Added: 28-Oct-2013
Appears in Collections:Minerals Exploration Reports (MEX)

Files in this Report:
File SizeFormat Add to
Download
EL25311_2011_A_01.pdf1.1 MBPDF Add
EL25311_2011_A_02_SurfaceGeochem.txt2.9 kBText Add
EL25311_2011_A_03_IPLine178.jpg3.19 MBJPEG Add
EL25311_2011_A_04_IPLine216.jpg2.78 MBJPEG Add
CR2011-1099_Geophysics.zip581.92 kBZIP Add


Items in GEMIS are protected by copyright unless otherwise indicated.

Get Adobe Reader