Please use this identifier to cite or link to this item:
Export to Endnote
https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/76713
Export to Endnote
Title: | Annual exploration report EL 25311 for period ending 21 December 2011 Pine Creek East |
Title Holder / Company: | Australia Mining & Gemstone |
Report id: | CR2011-1099 |
Tenure: | EL25311 |
Year: | 2011 |
Author: | Hou, M |
Abstract: | Exploration is planned to target Au mineralization (Quartz Vein-hosted) along the structure belt according to the works done last year. And a drilling program will be taken. Work carried out by AMG during Year 5 included: IP sections sound for special area along the structural belt about 43 points for two sections; some geological mapping along the belt about 9.39 Km2; some geological sections surveying about 1.66Km; Whole rocks analysis for Au about 11samples those taken during the geological survey along the belt. Because the dry season, the results of the IP sections sound survey was bad so we cannot decided to take the drilling program, but we try to do more works in the next year and try to take drilling. |
Date Added: | 28-Oct-2013 |
Appears in Collections: | Minerals Exploration Reports (MEX) |
Files in this Report:
File | Size | Format | Add to Download |
---|---|---|---|
EL25311_2011_A_01.pdf | 1.1 MB | Add | |
EL25311_2011_A_02_SurfaceGeochem.txt | 2.9 kB | Text | Add |
EL25311_2011_A_03_IPLine178.jpg | 3.19 MB | JPEG | Add |
EL25311_2011_A_04_IPLine216.jpg | 2.78 MB | JPEG | Add |
CR2011-1099_Geophysics.zip | 581.92 kB | ZIP | Add |
Items in GEMIS are protected by copyright unless otherwise indicated.