Please use this identifier to cite or link to this item:
Export to Endnote
https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/76616
Export to Endnote
Title: | Partial relinquishment report on sub-block relinquished effective 28 August 2011 EL 25709 Murphy project |
Title Holder / Company: | Murphy Uranium Bondi Mining |
Report id: | CR2011-0888 |
Tenure: | EL25709 |
Year: | 2011 |
Author: | Hedger, D Esser, D |
Abstract: | Work carried out on the relinquished sub-blocks comprised a detailed airborne magnetic and radiometric survey, a detailed geological interpretation, alpha track-etch sampling over target UC Eight which falls within the relinquishment area was sampled using this technique as part of the regional exploration program covering the entire Murphy Project area. In the 2008/2009 field season a regional phosphate exploration program was conducted and 1 RAB hole was drilled on the relinquished area. |
Date Added: | 28-Oct-2013 |
Appears in Collections: | Minerals Exploration Reports (MEX) |
Files in this Report:
File | Size | Format | Add to Download |
---|---|---|---|
EL25709_2011_P_01.pdf | 4.12 MB | Add | |
EL25709_2011_P_02_Appendix2.xls | 27.5 kB | Microsoft Excel | Add |
EL25709_2011_P_03_Appendix3_LithLog.xls | 660.5 kB | Microsoft Excel | Add |
EL25709_2011_P_04_Appendix4_DrillAssay.xls | 19.5 kB | Microsoft Excel | Add |
EL25709_2011_P_05_Appendix4_DrillAssay.txt | 3.37 kB | Text | Add |
EL25709_2011_P_06_DrillCollar.txt | 1.11 kB | Text | Add |
CR2011-0888_Geophysics.zip | 9.71 MB | ZIP | Add |
Items in GEMIS are protected by copyright unless otherwise indicated.