Please use this identifier to cite or link to this item: https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/76616
Export to Endnote
Title: Partial relinquishment report on sub-block relinquished effective 28 August 2011 EL 25709 Murphy project
Title Holder / Company: Murphy Uranium
Bondi Mining
Report id: CR2011-0888
Tenure: EL25709
Year: 2011
Author: Hedger, D
Esser, D
Abstract: Work carried out on the relinquished sub-blocks comprised a detailed airborne magnetic and radiometric survey, a detailed geological interpretation, alpha track-etch sampling over target UC Eight which falls within the relinquishment area was sampled using this technique as part of the regional exploration program covering the entire Murphy Project area. In the 2008/2009 field season a regional phosphate exploration program was conducted and 1 RAB hole was drilled on the relinquished area.
Date Added: 28-Oct-2013
Appears in Collections:Minerals Exploration Reports (MEX)

Files in this Report:
File SizeFormat Add to
Download
EL25709_2011_P_01.pdf4.12 MBPDF Add
EL25709_2011_P_02_Appendix2.xls27.5 kBMicrosoft Excel Add
EL25709_2011_P_03_Appendix3_LithLog.xls660.5 kBMicrosoft Excel Add
EL25709_2011_P_04_Appendix4_DrillAssay.xls19.5 kBMicrosoft Excel Add
EL25709_2011_P_05_Appendix4_DrillAssay.txt3.37 kBText Add
EL25709_2011_P_06_DrillCollar.txt1.11 kBText Add
CR2011-0888_Geophysics.zip9.71 MBZIP Add


Items in GEMIS are protected by copyright unless otherwise indicated.

Get Adobe Reader