Please use this identifier to cite or link to this item: https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/76533
Export to Endnote
Title: Annual technical report EL 25089, EL 25090, EL 25091, EL 25092, EL 25093, EL 25094 and EL 25143 Georgina Basin project for the period 2 October 2010 to 1 October 2011
Title Holder / Company: Mincor Zinc
Mincor Resources
Report id: CR2011-0710
Tenure: EL25089;  EL25091;  EL25092;  EL25093;  EL25094;  EL25143;  EL26933
Year: 2011
Author: Drieberg, B
Abstract: Previous exploration activities conducted by Mincor Zinc Pty Ltd including structural and geophysical interpretation and fluid-flow modelling were used in conjunction with soil geochemistry and culminated in the identification of a number of high priority drill targets for significant base metal mineralization. Two of these targets were planned to be drilled during the reporting period. However, this drilling and all other planned field activities had to be postponed until the 2011-12 field season due firstly, to heavy unseasonal rainfall the severely restricted access to the area, and secondly by drill rig availability.
Date Added: 28-Oct-2013
Appears in Collections:Minerals Exploration Reports (MEX)

Files in this Report:
File SizeFormat Add to
Download
GR045-09_2011_GA.pdf1.33 MBPDF Add


Items in GEMIS are protected by copyright unless otherwise indicated.

Get Adobe Reader