Please use this identifier to cite or link to this item:
Export to Endnote
https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/76533
Export to Endnote
Title: | Annual technical report EL 25089, EL 25090, EL 25091, EL 25092, EL 25093, EL 25094 and EL 25143 Georgina Basin project for the period 2 October 2010 to 1 October 2011 |
Title Holder / Company: | Mincor Zinc Mincor Resources |
Report id: | CR2011-0710 |
Tenure: | EL25089; EL25091; EL25092; EL25093; EL25094; EL25143; EL26933 |
Year: | 2011 |
Author: | Drieberg, B |
Abstract: | Previous exploration activities conducted by Mincor Zinc Pty Ltd including structural and geophysical interpretation and fluid-flow modelling were used in conjunction with soil geochemistry and culminated in the identification of a number of high priority drill targets for significant base metal mineralization. Two of these targets were planned to be drilled during the reporting period. However, this drilling and all other planned field activities had to be postponed until the 2011-12 field season due firstly, to heavy unseasonal rainfall the severely restricted access to the area, and secondly by drill rig availability. |
Date Added: | 28-Oct-2013 |
Appears in Collections: | Minerals Exploration Reports (MEX) |
Files in this Report:
File | Size | Format | Add to Download |
---|---|---|---|
GR045-09_2011_GA.pdf | 1.33 MB | Add |
Items in GEMIS are protected by copyright unless otherwise indicated.