Please use this identifier to cite or link to this item:
Export to Endnote
https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/76532Export to Endnote
| Title: | Second annual and final report for EL 27045 Mount Bundey project |
| Title Holder / Company: | Rum Jungle Resources |
| Report id: | CR2011-0700 |
| Tenure: | EL27045 |
| Year: | 2011 |
| Author: | Dunster, J |
| Abstract: | Exploration on EL 27045 essentially continued from Rum Jungle?s work on EL 23791. Two RC drill holes were drilled into geophysical anomalies but neither intersected mineralisation. A review of the geophysical data indicated that the best targets had been adequately tested. A desktop study failed to generate any additional leads. EL 27045 was surrendered in full. |
| Date Added: | 28-Oct-2013 |
| Appears in Collections: | Minerals Exploration Reports (MEX) |
Files in this Report:
| File | Size | Format | Add to Download |
|---|---|---|---|
| EL27045_2011_A.pdf | 842.36 kB | Add | |
| CR2011-0700_Appendices.zip | 25.1 kB | ZIP | Add |
Items in GEMIS are protected by copyright unless otherwise indicated.