Please use this identifier to cite or link to this item: https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/76532
Export to Endnote
Title: Second annual and final report for EL 27045 Mount Bundey project
Title Holder / Company: Rum Jungle Resources
Report id: CR2011-0700
Tenure: EL27045
Year: 2011
Author: Dunster, J
Abstract: Exploration on EL 27045 essentially continued from Rum Jungle?s work on EL 23791. Two RC drill holes were drilled into geophysical anomalies but neither intersected mineralisation. A review of the geophysical data indicated that the best targets had been adequately tested. A desktop study failed to generate any additional leads. EL 27045 was surrendered in full.
Date Added: 28-Oct-2013
Appears in Collections:Minerals Exploration Reports (MEX)

Files in this Report:
File SizeFormat Add to
Download
EL27045_2011_A.pdf842.36 kBPDF Add
CR2011-0700_Appendices.zip25.1 kBZIP Add


Items in GEMIS are protected by copyright unless otherwise indicated.

Get Adobe Reader