Please use this identifier to cite or link to this item:
Export to Endnote
https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/75803
Export to Endnote
Title: | Second annual report for EL 26657 Bull Pup period ended 30 May 2010 |
Title Holder / Company: | Rum Jungle Uranium |
Report id: | CR2010-0301 |
Tenure: | EL26657 |
Year: | 2010 |
Author: | Doyle, N Nowland, J |
Abstract: | No ground-based field work was conducted during the second year of tenure. A geophysical survey was flown by UTS Geophysics over the southern part of the tenement at 100m line spacing for about 15 line kilometres at 30m flying height. Tenement expenditure was $8377 against a covenant of $5500. |
Date Added: | 28-Oct-2013 |
Appears in Collections: | Minerals Exploration Reports (MEX) |
Files in this Report:
File | Size | Format | Add to Download |
---|---|---|---|
EL26657_2010_A.pdf | 4.02 MB | Add | |
CR2010-0301_Geophysics.zip | 27.8 MB | ZIP | Add |
Items in GEMIS are protected by copyright unless otherwise indicated.