Please use this identifier to cite or link to this item:
Export to Endnote
https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/75593
Export to Endnote
Title: | Annual report on EL 26138, EL 26139 and EL 26140 Murphy Project |
Title Holder / Company: | Murphy Uranium |
Report id: | CR2009-1036 |
Tenure: | EL26138; EL26139; EL26140 |
Year: | 2009 |
Author: | Esser, D |
Abstract: | Exploration during the 2009 field season included a detailed airborne magnetic and radiometric survey over EL's 26138, 26139 and 26140, comprising approximately 69,000 line kilometres at 100m line spacing and 50m flying height, two geophysical interpretations including target generation, ground reconnaissance of the targets and one vertical RC / diamond drill hole to a depth of 435.6m. |
NOTE: | Additional geophysics datasets are available on request |
Date Added: | 27-Oct-2013 |
Appears in Collections: | Minerals Exploration Reports (MEX) |
Files in this Report:
File | Size | Format | Add to Download |
---|---|---|---|
CR20091036_2009_GA.pdf | 3.14 MB | Add | |
CR2009-1036_Appendix3_Interp_Report_Haynes.zip | 1.73 MB | ZIP | Add |
CR2009-1036_Appendix4_Interp_Report_Coggan.zip | 3.52 MB | ZIP | Add |
CR2009-1036_Appendix5_Ground_Followup_Report_Esser.zip | 672.5 kB | ZIP | Add |
CR2009-1036_Appendix6_Drillhole_Data.zip | 129.2 kB | ZIP | Add |
Items in GEMIS are protected by copyright unless otherwise indicated.