Please use this identifier to cite or link to this item:
Export to Endnote
https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/75570
Export to Endnote
Title: | Second annual and final report for EL 25832 Darwin River period ended 26 October 2009 |
Title Holder / Company: | Rum Jungle Uranium |
Report id: | CR2010-0005 |
Tenure: | EL25832 |
Year: | 2010 |
Author: | Doyle, N |
Abstract: | During the second and final year of tenure in 2009, TEMPEST data flown in 2008 was received from Geoscience Australia and analysed. Absolutely no targets were identified from the data and the tenement is to be relinquished. No field work was conducted in the second year of tenure. A rehabilitation inspection was conducted in October 2009 to check on the progress of rehabilitation from the 2008 drilling. The company was happy with progress prior to a second west season. It was noted some assay results from RAB drilling in 2008 were not reported in the last annual report. Full results are submitted in this report. |
Date Added: | 27-Oct-2013 |
Appears in Collections: | Minerals Exploration Reports (MEX) |
Files in this Report:
File | Size | Format | Add to Download |
---|---|---|---|
EL25832_2010_A_01.pdf | 6.2 MB | Add | |
EL25832_2010_A_02_DrillSamples.csv | 48.43 kB | Unknown | Add |
CR2010-0005_Geophysics.zip | 8.08 MB | ZIP | Add |
Items in GEMIS are protected by copyright unless otherwise indicated.