Please use this identifier to cite or link to this item:
Export to Endnote
https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/75540
Export to Endnote
Title: | Partial relinquishment report for EL 25889 Mount Tolmer East for the second year ending 10 October 2009 |
Title Holder / Company: | Outback Metals |
Report id: | CR2009-0952 |
Tenure: | EL25889 |
Year: | 2009 |
Author: | Fraser, WJ |
Abstract: | During the second year of exploration Outback Metals examined the previous exploration reports in more detail and carried out modelling of the existing airborne geophysical data. Further work was delayed until the results of the GA AEM survey became available in September 2009. However this was a disappointment because it was found that GA had terminated the flight lines well to the east of the Litchfield National Park and EL 25889. The southern, relinquished portion of the EL is considered to have no immediate exploration potential. |
Date Added: | 27-Oct-2013 |
Appears in Collections: | Minerals Exploration Reports (MEX) |
Files in this Report:
File | Size | Format | Add to Download |
---|---|---|---|
CR2009-0952_EL_25889_Partial_Relinquishment_Report_For_PE_10_October_2009.pdf | 189.27 kB | Add |
Items in GEMIS are protected by copyright unless otherwise indicated.