Please use this identifier to cite or link to this item:
Export to Endnote
https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/75527
Export to Endnote
Title: | Year 3 relinquishment report for EL 24809 Hale River for the period 2 August 2006 to 1 August 2009 |
Title Holder / Company: | Hale Energy |
Report id: | CR2009-0931 |
Tenure: | EL24809 |
Year: | 2009 |
Abstract: | This report documents all exploration activities on the relinquished portion of EL 24809 between August 2nd 2006 and August 1st 2009 by Hale Energy Limited a wholly owned subsidiary of Thor Mining PLC. The HoistEM survey flown prior to the 2007 air core drilling programme defined conductive horizons within the palaeochannel and drilling confirmed the presence of prospective units and their depths. NB: All work was conducted on the retained portion of EL 24809. Additional data review and compilation during year 3 has resulted in the reduction of the tenement area to 57 graticular blocks. The most prospective part of the palaeochannel has been retained where previous drilling in the southeastern portion of the tenement delineated a narrow lignite horizon with anomalous uranium mineralisation which is a prospective reducing trap for 'roll front style' uranium mineralization. No further work is recommended on the relinquished portion of the tenement. |
Date Added: | 27-Oct-2013 |
Appears in Collections: | Minerals Exploration Reports (MEX) |
Files in this Report:
File | Size | Format | Add to Download |
---|---|---|---|
CR2009-0931_Hale_River_Relinquishment_Year3_2009.pdf | 469.69 kB | Add |
Items in GEMIS are protected by copyright unless otherwise indicated.