Please use this identifier to cite or link to this item: https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/75521
Export to Endnote
Title: Year 8 annual and final report for EL 10097 Mistake Creek
Title Holder / Company: Kajeena Mining Company
Report id: CR2009-0915
Tenure: EL10097
Year: 2009
Abstract: Kajeena Mining Company Pty Ltd held Exploration Licence 10097 in the Mistake Creek area, which was considered to have excellent exploration potential for lead - zinc, copper, gold and diamond deposits. In December 2006 Kajeena entered into a Joint Venture Agreement with Dingo Resources Pty Ltd. Dingo completed an orientation trip and sampling programme in December 2006 and a further field trip in October, 2007 during which further stream and soil sampling was undertaken. Soil and stream sediment sampling has failed to delineate clear geochemical anomalies over prospective magnetic features. Stream sampling in the area of previously drill tested copper mineralisation shows a low order anomaly which is not considered to be culturally derived. Dingo Resources had proposed that further sampling, several 3D IP surveys and drill testing be conducted in the next year of tenure. This work was not carried out.
Date Added: 27-Oct-2013
Appears in Collections:Minerals Exploration Reports (MEX)

Files in this Report:
File SizeFormat Add to
Download
CR2009-0915_EL_10097_Final_Report_December_2009.pdf131.98 kBPDF Add


Items in GEMIS are protected by copyright unless otherwise indicated.

Get Adobe Reader