Please use this identifier to cite or link to this item: https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/75455
Export to Endnote
Title: Annual report EL 25708, EL 25709 and EL 25710 Murphy Project 1 September 2008 to 31 August 2009
Title Holder / Company: Murphy Uranium
Report id: CR2009-0818
Tenure: EL25708;  EL25709;  EL25710
Year: 2009
Author: Esser, D
Stevenson, D
Abstract: Work during this period comprised: Alpha track sampling on targets UC04, UC06, UC16ext, UC18ext, UC19ext, UC23 and UC23ext, geological mapping, geological interpretation of the 2007 airborne magnetic and radiometric survey, target generation, eight RAB holes testing phosphate potential (289m) and three RC / diamond drill holes for 553m on target UC17, testing strong geochemical and geophysical anomalies.
NOTEAdditional geophysics datasets are available on request
Date Added: 27-Oct-2013
Appears in Collections:Minerals Exploration Reports (MEX)

Files in this Report:
File SizeFormat Add to
Download
GR098-09_2009_GA_01.pdf3.57 MBPDF Add
GR098-09_2009_GA_02_RCNQ_Drilling_Stats_All.xlsx14.78 kBMicrosoft Excel XML Add
CR2009-0818_Appendix2.zip43.37 kBZIP Add
CR2009-0818_Appendix3.zip21.58 kBZIP Add
CR2009-0818_Appendix4.zip877.97 kBZIP Add
CR2009-0818_Appendix5.zip30.28 kBZIP Add
CR2009-0818_Appendix6.zip347.2 kBZIP Add
CR2009-0818_Appendix7.zip347.2 kBZIP Add
CR2009-0818_Appendix8.zip17.12 kBZIP Add


Items in GEMIS are protected by copyright unless otherwise indicated.

Get Adobe Reader