Please use this identifier to cite or link to this item:
Export to Endnote
https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/75438
Export to Endnote
Title: | Annual and final report for EL 25716 the Peak Project for the period 6 September 2008 to 27 August 2009 |
Title Holder / Company: | Cullen Exploration |
Report id: | CR2009-0785 |
Tenure: | EL25716 |
Year: | 2009 |
Author: | Ringrose, C |
Abstract: | EL 25716 is centred ~ 140km ENE of Alice Springs in the Arunta Region. During the first year of tenure, previous exploration of the area was reviewed in detail and a field reconnaissance review was completed. EL 25716 (together with Cullen's adjoining EL 26142 - Yambla) was considered prospective for vein type and metasomatic type uranium mineralization. Cullen surrendered this tenement on 27th August 2009. No work carried out. During the year Cullen sought to farm out its interest due to the need to conserve funding. As no joint venture partner could be found, and due to a lowering of Cullen's general exploration expenditure, the tenement had to be surrendered. |
Date Added: | 24-Oct-2013 |
Appears in Collections: | Minerals Exploration Reports (MEX) |
Files in this Report:
File | Size | Format | Add to Download |
---|---|---|---|
EL25716_2009_AS.pdf | 2.18 MB | Add |
Items in GEMIS are protected by copyright unless otherwise indicated.