Please use this identifier to cite or link to this item:
Export to Endnote
https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/75374
Export to Endnote
Title: | Second annual report for EL 25711, EL 25887 and EL 25888 Casey Project for the period 17 September 2008 to 16 September 2009 |
Title Holder / Company: | Mithril Resources |
Report id: | CR2009-0681 |
Tenure: | EL25711; EL25887; EL25888 |
Year: | 2009 |
Author: | McKinnon-Matthews, J |
Abstract: | This report summarises the work completed on Exploration Licences 25711, 25887 and 25888 (Casey 2, 3 and 4 respectively) for the period 17th September 2008 to 16th September 2009. During this period the following work was completed: - Interpretation of a Gravity survey on 1kmx1km or 2kmx 2km spacing as infill to the 4km x 4km gravity survey completed by the NTGS - 50% reduction of ELs 25711 and 25887 - Withdrawal from EL 25888 No field work was conducted over the ELs during this reporting year. |
Date Added: | 24-Oct-2013 |
Appears in Collections: | Minerals Exploration Reports (MEX) |
Files in this Report:
File | Size | Format | Add to Download |
---|---|---|---|
CR20090681_2009_GA.pdf | 991.21 kB | Add |
Items in GEMIS are protected by copyright unless otherwise indicated.