Please use this identifier to cite or link to this item: https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/75360
Export to Endnote
Title: Year 5 annual report for EL 24142 Mt Ringwood for the period 4 October 2008 to 3 October 2009
Title Holder / Company: Australasia Gold
Report id: CR2009-0664
Tenure: EL24142
Year: 2009
Author: Ireland, T
Abstract: This report is the fifth Annual Report of the exploration of EL 24142 for the period 4th October 2008 to 3rd October 2009. The Year 4 Annual Report in fact covered drilling completed late in the previous reporting period and processing of results completed early in year 5. The drilling results showed quartz veining, disseminated sulphide and mineral alteration features along with elevated gold and arsenic values in areas that have previously (2007 reconnaissance program) been identified as being potentially mineralised. Upon review, the blocks containing this diffuse mineralisation have been relinquished. The Company experienced significant funding difficulties during the year, causing the postponement of proposed extension of the reconnaissance program. It now proposes that such reconnaissance should be undertaken on the remaining blocks during year 6.
Date Added: 24-Oct-2013
Appears in Collections:Minerals Exploration Reports (MEX)

Files in this Report:
File SizeFormat Add to
Download
EL24142_2009_A.pdf619.52 kBPDF Add


Items in GEMIS are protected by copyright unless otherwise indicated.

Get Adobe Reader