Please use this identifier to cite or link to this item:
Export to Endnote
https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/75096
Export to Endnote
Title: | Annual report on exploration activities, Pine Creek Project, for the period 18 April 2008 to 17 April 2009 |
Title Holder / Company: | United Uranium |
Report id: | CR2009-0263 |
Tenure: | EL24815 |
Year: | 2009 |
Author: | Prentice, I |
Abstract: | Exploration activities during the reporting period consisted of desktop review of the results of the previous years exploration activities, assessment of the applicability of further exploration methodologies in defining additional targets and the flying of an airborne electromagnetic survey (TEMPEST) in conjunction with Geoscience Australia. The TEMPEST survey was flown on east west flight lines on 555m spacing for a total of 794 flight line kilometres. The flying of the electromagnetic survey was delayed such that the data from the survey was not available as at the end of the reporting period. Interpretation of the data from the TEMPEST survey, combined with the digital elevation model and aerial photography, will be a key component of target definition for future exploration work. |
NOTE: | Additional geophysics datasets are available on request |
Date Added: | 24-Oct-2013 |
Appears in Collections: | Minerals Exploration Reports (MEX) |
Files in this Report:
File | Size | Format | Add to Download |
---|---|---|---|
EL24815_2009_A.pdf | 1.38 MB | Add |
Items in GEMIS are protected by copyright unless otherwise indicated.