Please use this identifier to cite or link to this item:
Export to Endnote
https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/74909
Export to Endnote
Title: | Year 2 reduction report for EL 25229 Douglas River, for period ending 8 November 2008 |
Title Holder / Company: | Territory Uranium |
Report id: | CR2008-0933 |
Tenure: | EL25229 |
Year: | 2008 |
Author: | Chapman, A |
Abstract: | EL 25229 is 120km south of Darwin (by road). Territory Uranium Company Ltd is exploring for uranium, and applied for EL 25229 to explore for uranium mineralisation. Work during Year 1 of tenure consisted of a review of both NTGS data and geophysical data. A list of previous Tenure was compiled. Work during Year 2 included a full assessment of uranium targets within 3 Daly River Project tenements EL 25222, EL 25223 and EL 25229 followed by a helicopter reconnaissance program. At the end of year two EL 25229 was reduced by 50%, targets identified in this review were retained hence no field work was undertaken within the relinquished ground. This report details the work done on the blocks of EL 25229 relinquished in the second year. |
Date Added: | 24-Oct-2013 |
Appears in Collections: | Minerals Exploration Reports (MEX) |
Files in this Report:
File | Size | Format | Add to Download |
---|---|---|---|
EL25229_2008_P.pdf | 3.34 MB | Add | |
CR2008-0933_Figures.zip | 1.15 MB | Unknown | Add |
Items in GEMIS are protected by copyright unless otherwise indicated.