Please use this identifier to cite or link to this item: https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/74884
Export to Endnote
Title: Casey Project EL 24646 Third annual technical report for the period 16 December 2007 to 15 December 2008
Title Holder / Company: Mithril Resources
Report id: CR2008-0881
Tenure: EL24646
Year: 2008
Author: McKinnon-Matthews, J
Abstract: This report summarises the work completed on EL 24646 for the period 16th December 2007 to 15th, December 2008. During this period, work completed included: 1) Analysis of all intervals from the diamond drilling completed in 2007, 2) A regional gravity survey at 1km x 1km spacing as part of 'bringing forward discovery', 3)Further interpretation of data collected during the life of the EL, 4)A 50% reduction in tenements area at the end of the 3rd Year.
Date Added: 24-Oct-2013
Appears in Collections:Minerals Exploration Reports (MEX)

Files in this Report:
File SizeFormat Add to
Download
EL24646_2008_A.pdf82.6 kBPDF Add
CR2008-0881_Appendices.zip1.69 MBZIP Add
CR2008-0881_Figures.zip3.28 MBZIP Add


Items in GEMIS are protected by copyright unless otherwise indicated.

Get Adobe Reader