Please use this identifier to cite or link to this item:
Export to Endnote
https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/74884
Export to Endnote
Title: | Casey Project EL 24646 Third annual technical report for the period 16 December 2007 to 15 December 2008 |
Title Holder / Company: | Mithril Resources |
Report id: | CR2008-0881 |
Tenure: | EL24646 |
Year: | 2008 |
Author: | McKinnon-Matthews, J |
Abstract: | This report summarises the work completed on EL 24646 for the period 16th December 2007 to 15th, December 2008. During this period, work completed included: 1) Analysis of all intervals from the diamond drilling completed in 2007, 2) A regional gravity survey at 1km x 1km spacing as part of 'bringing forward discovery', 3)Further interpretation of data collected during the life of the EL, 4)A 50% reduction in tenements area at the end of the 3rd Year. |
Date Added: | 24-Oct-2013 |
Appears in Collections: | Minerals Exploration Reports (MEX) |
Files in this Report:
File | Size | Format | Add to Download |
---|---|---|---|
EL24646_2008_A.pdf | 82.6 kB | Add | |
CR2008-0881_Appendices.zip | 1.69 MB | ZIP | Add |
CR2008-0881_Figures.zip | 3.28 MB | ZIP | Add |
Items in GEMIS are protected by copyright unless otherwise indicated.