Please use this identifier to cite or link to this item:
Export to Endnote
https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/74855
Export to Endnote
Title: | Report on relinquished blocks from EL 24841 Murphy Project at conclusion of year 2 |
Title Holder / Company: | Murphy Uranium |
Report id: | CR2008-0818 |
Tenure: | EL24841 |
Year: | 2008 |
Author: | Tahan, G |
Abstract: | EL 24841 comprised a total of 156 sub-blocks and was granted to Buffalo Gold Ltd. on the 1st August 2006 for a period of 6 years and later transferred to Bondi Mining Limited. The area was due for partial relinquishment after year two of tenure. From the available historical records that covered EL 24841, Bondi determined that Of the 297 sub-blocks held, the southern portion of the EL covered by 21 blocks presented low prospectivity for mineralisation and it was decided that this area would be excised from the EL. Other than the literature search that was carried out for the entire EL, no ground or airborne surveys were done over the area outlined by the 21 blocks. |
Date Added: | 24-Oct-2013 |
Appears in Collections: | Minerals Exploration Reports (MEX) |
Files in this Report:
File | Size | Format | Add to Download |
---|---|---|---|
EL24841_2008_P.pdf | 739.17 kB | Add |
Items in GEMIS are protected by copyright unless otherwise indicated.