Please use this identifier to cite or link to this item:
Export to Endnote
https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/74770
Export to Endnote
Title: | Annual report for EL 9807 and EL 9809 Mt Liebig Project 14 October 2007 to 13 October 2008 |
Title Holder / Company: | Deep Yellow |
Report id: | CR2008-0660 |
Tenure: | EL9807; EL9809 |
Year: | 2008 |
Author: | Menzies, J |
Abstract: | Exploration carried out over the reporting period included a reconnaissance field trip and an AEM survey. The reconnaissance field trip was conducted across the two tenements to evaluate drill access, geology, and potential drill water source. This was conducted in preparation for planned drilling in October/November 2008. The drilling has been deferred until the 2009 field season due to the CLC being unable to complete a Site Clearance Survey in 2008. The AEM survey was flown by GPX Aeroscience Pty Ltd across both tenements, 1000 line km were flown at 1.5 km spacing. The data obtained from the AEM survey is currently being interpreted. |
NOTE: | Additional geophysics datasets are available on request |
Date Added: | 24-Oct-2013 |
Appears in Collections: | Minerals Exploration Reports (MEX) |
Files in this Report:
File | Size | Format | Add to Download |
---|---|---|---|
CR20080660_2008_GA.pdf | 1.75 MB | Add |
Items in GEMIS are protected by copyright unless otherwise indicated.