Please use this identifier to cite or link to this item:
Export to Endnote
https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/74719
Export to Endnote
Title: | Finniss Range Project, EL 26399 Milne Inlet, Annual report for the period 7 September 2007 to 6 September 2008 |
Title Holder / Company: | Australian Tantalum Haddington Resources |
Report id: | CR2008-0593 |
Tenure: | EL26399 |
Year: | 2008 |
Author: | de Kever, N |
Abstract: | Exploration during the reporting period consisted of a brief literature review prior to reconnaissance mapping and rock chip sampling. A work program for new EL's 25604, 26399 and 26469 was planned. The initial program involved reconnaissance mapping across the tenements along 400m spaced east-west traverses with rock chip sampling of prospective targets. In August 2008, a total of 43.2 line km of reconnaissance mapping was completed over adjoining tenements EL 26399 and 26469 and 26504. 10.8 km of mapping was completed over EL 26399, and 9 rock chipswere taken. Rock chips were sent to KalAssay Laboratories in Perth for analysis. Laboratory details and detection limits are displayed in the company report. |
Date Added: | 24-Oct-2013 |
Appears in Collections: | Minerals Exploration Reports (MEX) |
Files in this Report:
File | Size | Format | Add to Download |
---|---|---|---|
EL26399_2008_A_01.pdf | 936.93 kB | Add | |
EL26399_2008_A_02_Surface_Rockchips.txt | 1.9 kB | Text | Add |
Items in GEMIS are protected by copyright unless otherwise indicated.