Please use this identifier to cite or link to this item: https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/74146
Export to Endnote
Title: Combined relinquishment report EL 5888 and EL 5889 Birrindudu-Supplejack Project from 22 August 2002 to 21 August 2007
Title Holder / Company: Tanami Exploration
Report id: CR2007-0551
Tenure: EL5888;  EL5889
Year: 2007
Author: Rohde, C
Abstract: EL 5888 and EL 5889 are part of the Birrindudu - Supplejack Project, which is situated approximately 230km east-southeast of Halls Creek, in the north-western portion of the Tanami Desert. The tenements are granted to Tanami Exploration NL (TENL), a wholly owned subsidiary of Tanami Gold NL (TGNL), a publicly listed company. From December 2000 to December 2005 it formed part of the Tanami (NT) JV, a Joint Venture agreement between Tanami Gold NL (TGNL) and Barrick Gold of Australia Limited (Barrick). A partial surrender was completed for both tenements in August 2007. Exploration on the relinquished tenement area was completed by Barrick and TENL. It included geochemical sampling, vacuum drilling and a geological re-interpretation. No significantly elevated results for gold were returned from the geochemical sampling and drilling.
Date Added: 23-Oct-2013
Appears in Collections:Minerals Exploration Reports (MEX)

Files in this Report:
File SizeFormat Add to
Download
CR20070551_2007_P.pdf31.6 MBPDF Add
CR2007-0551_Data.zip91.09 kBZIP Add


Items in GEMIS are protected by copyright unless otherwise indicated.

Get Adobe Reader