Please use this identifier to cite or link to this item: https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/74031
Export to Endnote
Title: Final technical report
Title Holder / Company: BHP Billiton Minerals
Report id: CR2007-0289
Tenure: EL22515;  EL22516;  EL22517;  EL23996;  EL23997;  EL23998;  EL23999;  EL24000;  EL24103;  EL24104;  EL24105
Year: 2007
Author: Rosengren, N
Barlow, M
Fletcher, M
Abstract: The Huckitta Project comprised 11 tenements for 12,241 square km and is situated between 200 and 300 km east of Alice Springs. First application for tenure was made on 13/04/2000 (EL22515-517). This final technical report documents all work completed by BHP Billiton on the Project. The project was a joint venture between BHP Billiton and Sumitomo Metal Mining Oceania Pty Ltd, with BHP Billiton managing the exploration work. Work on the project included field reconnaissance, a FALCONTM airborne gravity survey, ground gravity follow-up of targets generated by the airborne survey, and finally diamond drilling of six targets. Owing to the negative results gained the project was surrendered in January 2007.
NOTEAdditional geophysics datasets are available on request
Date Added: 23-Oct-2013
Appears in Collections:Minerals Exploration Reports (MEX)

Files in this Report:
File SizeFormat Add to
Download
CR20070289_2007_GAS.pdf9.88 MBPDF Add
CR2007-0289_Drillhole_Data.zip17.59 kBZIP Add


Items in GEMIS are protected by copyright unless otherwise indicated.

Get Adobe Reader