Please use this identifier to cite or link to this item: https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/74031
Export to Endnote
Title: Final technical report
Title Holder / Company: BHP Billiton Minerals
Report id: CR2007-0289
Tenure: EL22515;  EL22516;  EL22517;  EL23996;  EL23997;  EL23998;  EL23999;  EL24000;  EL24103;  EL24104;  EL24105
Year: 2007
Author: Rosengren, N
Barlow, M
Fletcher, M
Abstract: The Huckitta Project comprised 11 tenements for 12,241 square km and is situated between 200 and 300 km east of Alice Springs. First application for tenure was made on 13/04/2000 (EL22515-517). This final technical report documents all work completed by BHP Billiton on the Project. The project was a joint venture between BHP Billiton and Sumitomo Metal Mining Oceania Pty Ltd, with BHP Billiton managing the exploration work. Work on the project included field reconnaissance, a FALCONTM airborne gravity survey, ground gravity follow-up of targets generated by the airborne survey, and finally diamond drilling of six targets. Owing to the negative results gained the project was surrendered in January 2007.
NOTE: Additional geophysics datasets are available on request
Date Added: 23-Oct-2013
Appears in Collections:Minerals Exploration Reports (MEX)

Files in this Report:
File SizeFormat Add to
Download
CR20070289_2007_GAS.pdf9.88 MBPDF Add
CR2007-0289_Drillhole_Data.zip17.59 kBZIP Add


Items in GEMIS are protected by copyright unless otherwise indicated.

Get Adobe Reader