Title: Year five and final report on exploration activities 9 July 2002 to 26 March 2007
Title Holder / Company: Gravity Diamonds
Diamond Mines Australia
Rio Tinto Exploration
Report id: CR2007-0222
Tenure: EL22741
Year: 2007
Abstract: EL 22741 (Hodgson Diamonds Project) is located approximately 215 km SE of Katherine, to the east of the Larrimah and Maryfield Station homesteads. The EL was granted on 9 July 2002 and formed part of the Hodgson Diamonds Project. The tenement formed part of a farm-in agreement between Rio Tinto and Diamond Mines Australia Pty Ltd (DMA) covering numerous Rio Tinto tenements and applications in the Northern Territory. Gravity Diamonds Ltd (formerly Gravity Capital Ltd) is managing the farm-in arrangement for Diamond Mines Australia. Under the terms of the farm-in agreement, DMA has been conducting predominantly diamond exploration on tenements covered by the agreement by utilising the Falcon airborne gravity gradiometer system. The Falcon system has been shown to be effective in detecting kimberlite pipes. The tenement subject to this Report was considered prospective for commercial sources of diamonds. Historic sampling identified kimberlitic indicator mineral occurrences, including microdiamonds within the tenement. During year 3 of tenure, 16 Falcon(tm) anomalies were field inspected and sampled where appropriate. Two loam, five gravel and forty two soil samples were collected. Additionally, 19 RC holes and 1 RAB hole for a total of 961 metres were drilled to test 10 Falcon anomalies. No kimberlite pipes were discovered. Given the disappointing results from the drilling in year 3, an internal review of the potential for the Hodgson EL's was conducted during year 4 of tenure. The internal review process reaffirmed the potential of the area to host diamondiferous kimberlites and that their discovery would likely result from geophysically driven exploration programs. Existing Falcon data was reprocessed to take advantage of new processing techniques developed by BHP Billiton to enhance 'signal' and reduce 'noise' levels in the gravity gradient data. The reprocessed Falcon data confirmed that the anomalies previously targeted were indeed robust geophysical targets and that their potential to be the result of kimberlite intrusives had been adequately tested via the completed drilling. However, no additional priority targets were evident in the reprocessed dataset and as such no further work was recommended. EL 22741 was officially 'handed back' to Rio Tinto on 8 March 2007. Rio Tinto subsequently surrendered the tenement on 26 March 2007.
Date Added: 23-Oct-2013
Appears in Collections:Minerals Exploration Reports (MEX)