Please use this identifier to cite or link to this item:
Export to Endnote
https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/73850
Export to Endnote
Title: | Final report - preliminary assessment of resources and technical feasibility of producing salt chemicals from brines in the Karinga creek drainage system, Northern Territory |
Title Holder / Company: | Geo Processors |
Report id: | CR1992-0694 |
Tenure: | EL5689; EL6509; EL7060 |
Year: | 1992 |
Abstract: | This is resource estimate and pre-feasibility study assessing the use of playa lake brines in the modern Karinga Creek and palaeo-drainage drainage system to commercially produce salt chemicals through the use of natural energy. Potential products include various sulphates, chlorides, carbonates and bromides. Brines and sediment cores were sampled, assayed and classified. Laboratory test work was conducted. The report concluded that there was some confidence on which to further pursue a commercial operation. |
Date Added: | 23-Oct-2013 |
Appears in Collections: | Minerals Exploration Reports (MEX) |
Files in this Report:
File | Size | Format | Add to Download |
---|---|---|---|
CR19920694.pdf | 2.13 MB | Add |
Items in GEMIS are protected by copyright unless otherwise indicated.