Please use this identifier to cite or link to this item:
Export to Endnote
https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/73830
Export to Endnote
Title: | Annual report on EL 23474 Barrow Creek Project for the period 31 October 2005 to 30 October 2006 |
Title Holder / Company: | Haddington Resources |
Report id: | CR2006-0518 |
Tenure: | EL23474 |
Year: | 2006 |
Author: | de Kever, N |
Abstract: | This report covers exploration work carried out by Australian Tantalum Pty Ltd, a wholly owned subsidiary of Haddington Resources Limited (HDN) during the reporting period (31 October 2005 to 30 October 2006). Exploration conducted on EL 23474 during the reporting period included a small surface exploration program. 197 soil samples and 71 rock chip samples were taken. |
Date Added: | 23-Oct-2013 |
Appears in Collections: | Minerals Exploration Reports (MEX) |
Files in this Report:
File | Size | Format | Add to Download |
---|---|---|---|
EL23474_2006_A_01.pdf | 1.58 MB | Add | |
EL23474_2006_A_02_Rockchip_Geochem.txt | 6.26 kB | Text | Add |
EL23474_2006_A_03_Rockchip_Location.txt | 11.87 kB | Text | Add |
EL23474_2006_A_04_Soil_Sample_Location.txt | 21.79 kB | Text | Add |
EL23474_2006_A_05_Soil_Sample_Geochem.txt | 8.08 kB | Text | Add |
Items in GEMIS are protected by copyright unless otherwise indicated.