Please use this identifier to cite or link to this item:
Export to Endnote
https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/73460
Export to Endnote
Title: | Partial Relinquishment Report for EL 5888 Supplejack Project |
Title Holder / Company: | Barrick Gold of Australia |
Report id: | CR2005-0492 |
Tenure: | EL5888 |
Year: | 2005 |
Author: | Purcell, G |
Abstract: | This report details the exploration activities conducted within the relinquished portion of the Supplejack JV project, from 22 August 2002 to 21 August 2005. The Supplejack Project comprises Exploration Licence (EL) 5888 and forms part of the Tanami (NT) JV, a Joint Venture agreement between Tanami Gold NL (TGNL) and Barrick Gold of Australia Limited (BGAL). The tenement was granted during 2002 for a period of six years. The exploration work during this period was conducted by Barrick Gold of Australia Limited and consisted of an Aboriginal heritage survey, aeromagnetic survey, surface geochemical sampling and vacuum drilling (VAC). |
Date Added: | 23-Oct-2013 |
Appears in Collections: | Minerals Exploration Reports (MEX) |
Files in this Report:
File | Size | Format | Add to Download |
---|---|---|---|
EL5888_2005_P_01.pdf | 3.32 MB | Add | |
CR2005-0492_EL5888_2005_P_02_Verification_Report.pdf | 246.92 kB | Add | |
EL5888_2005_P_03_Plate_3.pdf | 2.85 MB | Add | |
CR2005-0492_Data.zip | 103.09 kB | ZIP | Add |
CR2005-0492_Geophysics.zip | 39.34 MB | ZIP | Add |
Items in GEMIS are protected by copyright unless otherwise indicated.