Please use this identifier to cite or link to this item: https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/73093
Export to Endnote
Title: Annual report Tolmer Project EL 4856 and 4857
Title Holder / Company: Total Mining Australia
PNC Exploration Australia
Report id: CR1992-0136
Tenure: EL4856;  EL4857
Year: 1992
Author: Harrop, DW
Abstract: Exploration was undertaken to look for unconformity style uranium mineralisation at the contact between the Burrell Creek Formation and the overlying Tolmer Group. Drilling at the Eccles 11 Prospect found mineralisation to be concentrated around the TOL-P-96. The mineralisation appears stratiform and intimately associated with an interbedded sequence of chlorite and graphite rich schist and interbedded pegmatite, greisen veins. It is not economic. Analysis of exploration techniques used found that the EM37 technique gave many false results while the VLF-Wadi survey was fast and effective
Date Added: 23-Oct-2013
Appears in Collections:Minerals Exploration Reports (MEX)

Files in this Report:
File SizeFormat Add to
Download
CR19920136.pdf4.47 MBPDF Add


Items in GEMIS are protected by copyright unless otherwise indicated.

Get Adobe Reader