Please use this identifier to cite or link to this item:
Export to Endnote
https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/72966
Export to Endnote
Title: | Structure of the North Ringwood Old Workings and the Pelican Prospect, Mount Ringwood Project. |
Title Holder / Company: | Nobelex |
Report id: | CR1991-0328 |
Tenure: | ERL87 |
Year: | 1991 |
Author: | Vearncombe, JR |
Abstract: | Both North Ringwood old workings and The Pelican Prospect occur on an upright anticline-syncline pair. Along strike extrapolation suggests that they do not occur on the same fold pair. Gold mineralization at both prospects is restricted to quartz veins. At North Ringwood it is noted that mineralization is late and superimposed on the fold structures. The Pelican prospect at +1Mt at 0.8 g-t is too low grade and the Ringwood Old Workings at 50 000 at 2.8 g-t Au is too small to be economic. Work should be undertaken in the area between the prospects to delineate a possible further and economic resource. |
Date Added: | 23-Oct-2013 |
Appears in Collections: | Minerals Exploration Reports (MEX) |
Files in this Report:
File | Size | Format | Add to Download |
---|---|---|---|
CR19910328.pdf | 1.25 MB | Add |
Items in GEMIS are protected by copyright unless otherwise indicated.