Please use this identifier to cite or link to this item:
Export to Endnote
https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/72964
Export to Endnote
Title: | Annual Report for EL 4879 Mount Fitch for year ending 25 May 1991. |
Title Holder / Company: | Power Resources (Australia) Compass Resources Guardian Resources |
Report id: | CR1991-0320 |
Tenure: | EL4879 |
Year: | 1991 |
Author: | Boots, MK |
Abstract: | At North Mount Fitch a diamond drill hole (MFN1) was completed in Coomalie Dolomite at 190.5m after intersecting anomalous lead zinc mineralization in the Whites Formation. MFN 2, a percussion hole east of MFN1, intersected significant secondary copper mineralization prior to termination due to excessive water flow at 60m. Diamond drilling (MB1) at the Mount Burton Prospect did not encounter any significant base metal mineralization. FB1, a diamond drill hole in the Area 55B prospect, passed through a major fault zone prior to intersecting Coomalie Dolomite. Whites Formation comprised pyritic shales without appreciable base metal mineralisation. |
Date Added: | 23-Oct-2013 |
Appears in Collections: | Minerals Exploration Reports (MEX) |
Files in this Report:
File | Size | Format | Add to Download |
---|---|---|---|
CR19910320.pdf | 832.54 kB | Add |
Items in GEMIS are protected by copyright unless otherwise indicated.