Please use this identifier to cite or link to this item:
Export to Endnote
https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/72863
Export to Endnote
Title: | Annual report Tolmer project EL 4857 |
Title Holder / Company: | Total Mining Australia PNC Exploration Australia |
Report id: | CR1991-0252 |
Tenure: | EL4857 |
Year: | 1991 |
Author: | Melville, P |
Abstract: | Drilling of the T10 anomaly failed to highlight any significant radiometric anomalism. At the March Fly prospect, 7 holes were drilled to define the mineralisation intersected by the 1988 TOL-P-6 hole. The drilling of the March Fly prospect confirmed the occurrence of thin relatively high grade pool of uranium mineralisation north and south of the TOL-P-6 hole. The new drilling did not upgrade tonnage-grade of the resource. The results imply that no economic resource exists at March Fly. |
Date Added: | 23-Oct-2013 |
Appears in Collections: | Minerals Exploration Reports (MEX) |
Files in this Report:
File | Size | Format | Add to Download |
---|---|---|---|
CR19910252.pdf | 3.76 MB | Add |
Items in GEMIS are protected by copyright unless otherwise indicated.