Please use this identifier to cite or link to this item: https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/72863
Export to Endnote
Title: Annual report Tolmer project EL 4857
Title Holder / Company: Total Mining Australia
PNC Exploration Australia
Report id: CR1991-0252
Tenure: EL4857
Year: 1991
Author: Melville, P
Abstract: Drilling of the T10 anomaly failed to highlight any significant radiometric anomalism. At the March Fly prospect, 7 holes were drilled to define the mineralisation intersected by the 1988 TOL-P-6 hole. The drilling of the March Fly prospect confirmed the occurrence of thin relatively high grade pool of uranium mineralisation north and south of the TOL-P-6 hole. The new drilling did not upgrade tonnage-grade of the resource. The results imply that no economic resource exists at March Fly.
Date Added: 23-Oct-2013
Appears in Collections:Minerals Exploration Reports (MEX)

Files in this Report:
File SizeFormat Add to
Download
CR19910252.pdf3.76 MBPDF Add


Items in GEMIS are protected by copyright unless otherwise indicated.

Get Adobe Reader