Please use this identifier to cite or link to this item: https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/72761
Export to Endnote
Title: Report on drilling carried out August 1988 Port Darwin camp claims
Title Holder / Company: Biddlecombe, RM
Leech, PJ
Northern Territory Gold Mining
Report id: CR1990-0440
Tenure: MCN1549;  MCN1550;  MCN1552;  MCN1553;  MCN2525
Year: 1990
Author: Orridge, GR
Abstract: 12 R.C. percussion drill holes tested the Red Hill Area. Correlation of features of the geology and mineralisation is poor, suggesting structural complications such as faulting. Only low grades were intersected, through nuggets have been located, the bulk grade is thought to be uneconomic. 8 R.C. percussion drill holes tested the Cornerpost area. Wide zones of low grade mineralisation were encountered in pyrite rich meta sediments with minor quartz veining. The mineralisation intersected is believed to be characteristic of the Cornerpost area.
Date Added: 23-Oct-2013
Appears in Collections:Minerals Exploration Reports (MEX)

Files in this Report:
File SizeFormat Add to
Download
CR19900440.pdf5.58 MBPDF Add


Items in GEMIS are protected by copyright unless otherwise indicated.

Get Adobe Reader